skip to content

Bespoke Double Conic in Maesteg, Wales

  • Page Image
  • Page Image
  • Page Image
  • Page Image
  • Page Image
  • Page Image
  • Page Image

Tensile Solutions designed, fabricated and installed a bespoke 9m x 5m 'Double Conic' tensile fabric structure as part of the outdoor market regeneration in Maesteg, Wales.

With the market due to open in a few weeks, the canopy provides the focal point for the area and will double up as a cover for the stage and performance area due to be built underneath it.

The design incorporates a strengthened steel superstructure for the estimated 1000kg of audio visual and lighting equipment due to be hung from it!

Also fundamental to the design is an integrated and internal water drainage system. A feat of creativity turned what is in essence a free draining conical structure into one that will collect the water landing on the canopy and channel it through the booms, down the masts and out below finished floor level. Perimeter scalloped canopy up stands and custom draining stainless steel membrane plates keep the elegant look of the structure but add function to its form. All steel work is galvanised and painted for extreme corrosion protection. The canopy is a high specification Ferrari Pre-Contraint PVC coated polyester fabric in 'Tuscan'.

The double conic was installed in just over a day using a telehandler and we finished ahead of program. 

We'll put some pictures up of the finished area just as soon as we get some. In the meantime here are some from the build.

For more information about this project or to see if we can help you with yours, please contact us.

Tags: Maesteg | Double Conic | Performance Canopy

This entry was posted on 29 April 2013 at 12:19 and is filed under Design and Build | Installation | Project Management | Crest.

Leave a Reply

(will not be published)